skip to Main Content

Kerry Foods – Shillelagh WwTP (IE)

Wastewater Treatment Plant Drum Screen & DAF

Upgrade works consisted of:

  • New Wedge Wire Drum Screen (60 m3/hour) and gravity feed new DAF plant.
  • Hydro DAF (60 m3/hour) 304 Stainless Steel with stainless steel covers.
  • Stairs and access platform for Drum Screen & DAF.
  • DAF treated effluent discharge by gravity to existing pump sump.
  • DAF sludge pumped to existing DAF sludge pipeline.
  • Stainless Steel Control panel with PLC & HMI to be housed in existing control room.
  • Design, supply, installation and commissioning.

Other Projects

Back To Top