Tipperary Co-op – Tipperary Town WwTP (IE)

Wastewater Treatment Plant Upgrade

Hydro International Ltd. acted as Designer, Main Contractor, PSDP and PSCS, offering a turnkey design and build solution for the Tipperary Co-operative WwTP. This included process design, MEICA design and installation, civil design and co-ordination, testing and commissioning and operation and maintenance.  The works undertaken by Hydro International are outlined below:

Preliminary & Primary Treatment including DAF, existing balance tank refurbishment and associated chemical dosing systems and pumping requirements.

Secondary Treatment including anoxic tank, aeration tank, final settlement clarifier, RAS/WAS pumping system including mixers and interstage pumping requirements.

Tertiary Treatment including polishing DAF and associated chemical dosing equipment.

Control, automation, and telemetry for the upgraded works.

Chemical dosing equipment, bulk tanks, dosing pumps and accessories.

Civil Works including civil design required for the constructions of the associated items within the WWTP.